The built portion of this project consist of roughly 6oo surfaces glued together (4 straight days of building)....the process was a difficult one due to the scale of the pieces. Its a little odd to say that the 1 to 1 scale mock up might have been easier to build then this 3/4 model was...but time will tell after break. Hopefully I'll be able to build this during break! Wish me luck!!
about
2AeM is a cooperative design effort composed of the 3 young Midwestern-sprung, spread-the world-out, out-and-out Architecture student-architects: nicholas m. reiter, Jessie Wilcox and Peter Nguyen. The team base was originally Milwaukee, WI but since has become a mobile abstraction or a state of mind. 2AeM is sometimes physical, sometimes sober, partially virtual, usually vocal, and all-the-time IN-it.
We are track jumpers, demons, villains and observing you right now. Design is the New and so are the Stakes.
We are track jumpers, demons, villains and observing you right now. Design is the New and so are the Stakes.
Tuesday, December 13, 2011
A-Periodics?!?! NO....just A tile.
Finishing up my final studio project this quarter for the M.Arch 1 program and this is what i'm left with. 1) a piece of code for danzer tiling, 2) Connection points to make clean connection among tiles, and 3) 100 extra pieces I was never able to put together.....
The built portion of this project consist of roughly 6oo surfaces glued together (4 straight days of building)....the process was a difficult one due to the scale of the pieces. Its a little odd to say that the 1 to 1 scale mock up might have been easier to build then this 3/4 model was...but time will tell after break. Hopefully I'll be able to build this during break! Wish me luck!!
The built portion of this project consist of roughly 6oo surfaces glued together (4 straight days of building)....the process was a difficult one due to the scale of the pieces. Its a little odd to say that the 1 to 1 scale mock up might have been easier to build then this 3/4 model was...but time will tell after break. Hopefully I'll be able to build this during break! Wish me luck!!
Sunday, December 11, 2011
ice cube celebrates the eames
yes! meet your new meme
Labels:
charles and ray eames,
design,
ice cube,
modernism,
pre-fab
Saturday, December 10, 2011
the [dark] cloud
so.... a few days ago we were thrown for a psychological loop.
here's why:
winy maas came to lecture in wood auditorium and two days later a studio mate sent us this link to "the cloud" MVRDV's new project. basically, it's our housing project [but, of course we like out gesture more...]. so, in an attempt to maintain our design genius we - jokingly - said winy must have seen our project and stolen our idea.
i hope that's not the case, but it helped us feel better about our work. then, look what pops up on msn's homepage [not mine] and being hotly debated.
seriously?! get over it people. support the arts, and optimism!
here's why:
winy maas came to lecture in wood auditorium and two days later a studio mate sent us this link to "the cloud" MVRDV's new project. basically, it's our housing project [but, of course we like out gesture more...]. so, in an attempt to maintain our design genius we - jokingly - said winy must have seen our project and stolen our idea.
i hope that's not the case, but it helped us feel better about our work. then, look what pops up on msn's homepage [not mine] and being hotly debated.
seriously?! get over it people. support the arts, and optimism!
Labels:
2A_eM work,
GSAPP,
housing,
housing project,
MVRDV,
new york,
the cloud,
winy maas
Thursday, December 8, 2011
[update]: housing studio
whoa. get ready folks. we're coming for ya the 14th!
corner of 125th and lexington
look up!
[update]: housing studio
live : work
in full on production mode. learning to tame the vray beast....
semeseter is wrapping up [wrapped for most]
i want to keep working with my partner!
Wednesday, December 7, 2011
Thursday, December 1, 2011
Subscribe to:
Posts (Atom)