can someone tell me what's going on here?
about
2AeM is a cooperative design effort composed of the 3 young Midwestern-sprung, spread-the world-out, out-and-out Architecture student-architects: nicholas m. reiter, Jessie Wilcox and Peter Nguyen. The team base was originally Milwaukee, WI but since has become a mobile abstraction or a state of mind. 2AeM is sometimes physical, sometimes sober, partially virtual, usually vocal, and all-the-time IN-it.
We are track jumpers, demons, villains and observing you right now. Design is the New and so are the Stakes.
We are track jumpers, demons, villains and observing you right now. Design is the New and so are the Stakes.
Showing posts with label modelling. Show all posts
Showing posts with label modelling. Show all posts
Friday, April 6, 2012
Thursday, March 29, 2012
one man's trash...
in the beginning there was a pile of shit.
...
...
what happened?! i blacked out.
when i came to, i had this thing in front of me.
two overlapping paths wrap around a central theater space.
one public path, is rendered with solid floors and light walls, the other, below, is rendered in opposite materials. reveals provide visual and auditory connectections between the paths and enhance the atmosphere of each through reverberation and echo.
orpheus. down down down. underground!
Labels:
2A_eM work,
modelling,
orpheus,
theater,
underground
Tuesday, December 13, 2011
A-Periodics?!?! NO....just A tile.
Finishing up my final studio project this quarter for the M.Arch 1 program and this is what i'm left with. 1) a piece of code for danzer tiling, 2) Connection points to make clean connection among tiles, and 3) 100 extra pieces I was never able to put together.....
The built portion of this project consist of roughly 6oo surfaces glued together (4 straight days of building)....the process was a difficult one due to the scale of the pieces. Its a little odd to say that the 1 to 1 scale mock up might have been easier to build then this 3/4 model was...but time will tell after break. Hopefully I'll be able to build this during break! Wish me luck!!
The built portion of this project consist of roughly 6oo surfaces glued together (4 straight days of building)....the process was a difficult one due to the scale of the pieces. Its a little odd to say that the 1 to 1 scale mock up might have been easier to build then this 3/4 model was...but time will tell after break. Hopefully I'll be able to build this during break! Wish me luck!!
Friday, November 5, 2010
b4; timelapse ii
so far.
frame:
1 x 2's + mdf
topo:
1/8" cardboard
context:
3/32" chipboard [yeah, i know, wtf were we thinking]
application:
gesso
pigments + india ink
acrylic
tissue paper
cheese cloth
newspaper
pigments
beeswax
pigments
fire
more, i'm sure to be applied
my fingers are still gray/black from the last night's marathon rally
Labels:
2A_eM work,
architectural education,
GSAPP,
modelling,
time lapse video,
video
Tuesday, November 2, 2010
b4; timelapse
for brief 4 @ gsapp we're charged with designing a climatology lab for a group of 10 scientists and a whole host of spaces for public interaction. the site is in the shadow of the brooklyn bridge near pier 17 on the old peck slip. it's offering up untold treasures of texture, context, potential and inspiration. hard edges, long shadows, people milling about everywhere, rusted metal, driftwood, more more more to come.
ps. great job everyone. it's going to look killer. updates to come...
Subscribe to:
Posts (Atom)



